Team Work Log

Team: Lorenzo Zullo, Onil Morshed, Rajwat Singh, Dan Nguyen

Date Activity Duration Lorenzo Onil Rajwat Dan
3/5/2025 Connect remotely to the Raspberry Pi 2 hr
3/17/2025 Calibrated motors and tested car movements 2 hr
3/21/2025 Tried to fix camera and ran first line-following tests 1.5 hr
3/28/2025 Calibrated robot and found best grayscale values 3 hr
4/1/2025 Assembled and organized sensor wiring 2 hr
4/4/2025 Explored line-following logic 2 hr
4/5/2025 Added debug logging for decision tracking 2 hr
4/6/2025 Smooth out turns & backup logic 3 hr
4/8/2025 Backup behavior when stuck 2 hr
4/12/2025 Recalibrated grayscale values 3 hr
4/18/2025 Added timed pauses at intersections 3 hr
4/22/2025 Directional priority system 2 hr
4/25/2025 Built project website & activity log 2 hr
4/26/2025 Refactored code for modularity 3 hr
4/27/2025 Simulated edge-case scenarios and improved turn mechanics 4 hr
4/29/2025 Tested on multiple track layouts and adapted new intersection handling 3 hr
4/30/2025 Uploaded final code, footage & docs 4 hr

← Back to main documentation