Step One- Axle
Step Two-Center
Step Three-Sides
Step Four-Sensors
Sensor History
 
 
 
Construction of sides
Pieces needed for a side, both are the same
ntire side: (2) 11 hole pieces, (2) 9 hole piece,7 hole piece, (2) 5 hole pieces, (4) 3 hole pieces, (2) 4 peg flat pieces, (11) connectors, (2) brick side connectors

(2) Two 3 hole pieces are topped with a flat piece.
These go right above the motors. They are topped with a 11 hole piece that is snapped into the body of the brick and snapped into these other two pieces

Completed side shown

 

Five hole pieces snapped between first peg in the bottom piece in the back and the second peg on the top and the forth from the front piece is snapped to the first peg from the left in the front

Second from right(front) on brick to first on 2 binded(snapped together) 9 hole pieces, a 7 hole piece is added on top of the 9 hole piece on the side closer to the brick.

Also a 9 hole piece is snapped between the two five hole pieces, from the middle of the back five hole piece to the second from the bottom five hole piece in the front

Finally a 11 hole piece is connected
Fifth from top peg on the diagnol front piece, to first peg on the new 11 hole piece is connected to the 9 hole piece running down its side at its fifth hole(from left)